Home battery assessment
EG4 battery savings & installer quotes
- EG4 WallMount All Weather includes battery self-heating
- Pair the battery with an inverter suited to your installation
- Check state and utility rebates; eligibility varies
- Shortlist Solar-vetted installers, subject to availability
What could a battery save you?
WallMount All Weather

Enter your ZIP code to get started.
No contact details needed to see your estimate. Request quotes only when you’re ready.
Estimates use a general battery model, not a specific product. Actual savings depend on your electricity plan, usage and installation. Quotes depend on installer availability.
What goes into your EG4 battery?
EG4 offers home battery and inverter products alongside a local-installer program. Equipment can be quoted separately, so distinguish a hardware order from a complete permitted installation.
Existing solar and compatibility
A battery advertised for sale does not include the electrical design, permits, installation or commissioning unless the quote explicitly says so.
From your EG4 assessment to a quote request
Start with your ZIP code, whether you have solar and your power bill. The assessment uses those answers to model battery savings, with assumptions shown alongside the result; it is not a performance calculation for a particular EG4 model.
If you want to continue, your EG4 preference and assessment answers carry into the quote form on this page.
A request is subject to participating-installer availability for your address and EG4. Ask any matched company who will do the work, and verify the crew’s current licensing, insurance and relevant manufacturer training.
Before you accept a EG4 proposal
- Specify every EG4 inverter, battery and control component in the proposed system.
- Check whether the installer supplies the equipment or accepts customer-purchased products.
- Itemize the electrical work and commissioning separately from the hardware list.
A closer look at your EG4 installation plan
Decide whether your EG4 inquiry is for a completed installation or help with equipment already selected. The assessment can start either conversation. It does not approve a retailer’s hardware bundle. Give a contractor the full inverter and battery identifiers before ordering. Ask which items it supplies and which parts of the electrical scope remain outside an equipment-only offer. Establish whether the company accepts customer-purchased EG4 units before arranging delivery.
Separate the EG4 product choices from the job of making them work at the property. A family name does not identify every control or mounting accessory. Request a component schedule alongside the site work. Have the company explain how it will commission the selected arrangement. If procurement changes a product generation, get the revised scope before using the original quotation as a comparison. Keep any omitted EG4 accessories visible as items to resolve, rather than assuming they come with the installation.
Use the quote discussion to settle who supports the EG4 installation after handover. The selling distributor and electrical contractor may have different responsibilities. Ask who coordinates diagnosis when a problem involves both battery and inverter. Keep the delivered model list with that answer. If expansion is planned, ask the designer to document the conditions attached to adding equipment later. The commissioning record should reflect any substitution made to the original EG4 bundle.
Prepare your EG4 quote checklist
Bring the EG4 installer a recent electricity bill, your tariff name and any interval-usage data your utility makes available. Describe when the home uses power, when an EV is parked at home and whether heating, cooling or a pump dominates demand; the estimate’s bill band is a starting point rather than a replacement for those details.
Ask for the EG4 proposal to separate equipment, electrical changes, permits, commissioning and any optional work. Confirm the usable capacity, continuous output and backup arrangement for the complete configuration being quoted, and identify exclusions before agreeing to an installation scope.
Have each EG4 installer use the same list of appliances and the same backup priorities when preparing a design. If two proposals differ in battery quantity, controller equipment or circuits, ask for the reason in writing; a lower total may reflect a different job rather than a saving on an equivalent system.
Check the assumptions behind a EG4 savings projection: electricity rates, export credits, daily usage, charging sources, reserve settings and future price increases. Request a comparison using your current tariff as well as any proposed tariff change, and keep bill savings separate from equipment cost, financing and the value you place on backup.
Before accepting a EG4 contract, identify the company responsible for permits, utility permission, inspections and commissioning. Confirm the payment milestones and what happens if site inspection changes the equipment or electrical scope; do not treat an indicative assessment or an initial quote as a completed site design.
Keep the final EG4 equipment schedule, warranty conditions and workmanship terms with the signed proposal. Ask who handles an installation fault, whether diagnosis and labor are covered and how to contact service if the original salesperson is unavailable; a manufacturer's equipment warranty does not by itself explain every installation responsibility.
EG4 assessment questions
Will the assessment predict my exact EG4 savings?
The result is not a calculation for a named EG4 inverter or battery bundle. It models household storage using the answers entered here. Electrical output, supported pairing and site suitability require a separate design assessment using the actual EG4 equipment proposed.
Can I explore EG4 if I already have solar?
A battery advertised for sale does not include the electrical design, permits, installation or commissioning unless the quote explicitly says so.
What happens when I request EG4 quotes?
Your EG4 choice carries into the optional contact step with the household answers. The matching process retains that preference and considers current installer eligibility, including verified brand credentials where available; it can return up to a maximum of three companies, fewer or none. Confirm whether a responding contractor offers installation or equipment supply only.
Does an EG4 assessment commit me to buying?
Viewing an EG4 assessment does not place a hardware order. There is no homeowner fee to explore the estimate or submit the optional request. Decide separately whether an installer’s equipment schedule, site-work scope and contract meet the requirements of the project.
Ready to price a EG4 installation?
Estimate your potential savings, then request quotes for a EG4 installation when you’re ready.
Start or resume my assessmentSources and review
Assessment and buying questions updated September 10, 2026. Confirm the current US documentation for the equipment in your proposal; specifications and approved configurations can change.